Scope of Work:
- Electrical:
- Installation of cables as per BOQ
- Installation of cable tray with all accessories as per BOQ
- Installation of sub-station equipments
- Installation of LT panel and MDB
- Installation of Bus Bar as per BOQ
- Installation of Lighting System
- Installation of Plug/Socket/Miscellaneous accessories.
- Mechanical:
Steel Truss:
- Installation of Steel truss with all accessories within the factory building
- Installation of piping as per BOQ
- Installation of bends/tee/flanges as per BOQ
- Installation of Valves as per BOQ
- Installation of Strainers/Water flow meter
- Installation of Pressure gauges
Boiler:
- Installation of boiler with all accessories
- Installation of piping as per BOQ
- Installation of bends/tee/flanges as per BOQ
- Installation of Valves as per BOQ
- Installation of Pressure Gauges
- Installation of Insulation as per BOQ
Air Compressor:
- Installation of Air Compressor with all accessories
- Installation of piping as per BOQ
- Installation of bends/tee/flanges as per BOQ
- Installation of Valves as per BOQ
- Installation of Strainers
- Installation of Pressure Gauges
- Installation of Air Receivers
Humidifier:
- Installation of humidifier with all accessories
- Installation of ducting as per BOQ
Chimney:
- Installation of Chimney
- Installation of Exhaust Ducts from Engine to Chimney
Factory Main Machinery:
- Installation of Sew Machine
- Installation of Cutting Machine
- Installation of Washing Machine
Installation of Ironing Machine